FOR / ARCHITECTS

Waterproofing Consultation & Detailing Support for Architects

Most waterproofing failures are detailing failures, decided on a drawing long before anyone opens a bucket. We work with architects at detail stage on junctions, upturns, thresholds, penetrations and movement joints, so the system specified is one that can actually be built.

An architect or design team member specifying waterproofing for a project.

CONSTRAINTS

What actually makes this difficult

The technical work overlaps with every other kind of building. The constraints are what differ, and they are what a contractor either understands or does not.

Buildability
A detail that cannot be executed on site becomes an improvisation, which becomes a leak.
Finish integration
The barrier has to sit under the intended finish without dictating the architecture.
Design liability
A specified system that fails is a professional exposure.
Cost realism
The specification has to survive value engineering with its performance intact.
METHOD

How we work on these projects

  • Review details at design stage and flag junctions that will not perform as drawn.
  • Advise on system selection against exposure, traffic, movement and finish.
  • Provide sections for the tricky junctions — thresholds, planters, movement joints, penetrations.
  • Identify what can safely be value-engineered and what must not be, in writing.
TYPICAL SCOPE

Systems this kind of project usually needs

QUESTIONS

Architects — questions we get asked

Will you review details before tender?

Yes. Reviewing at detail stage is when a junction problem costs a conversation. The same problem found during construction costs demolition.

Which junctions cause the most failures?

Thresholds where a terrace meets an internal floor level, planter and drainage details on podiums, movement joints carried through a build-up, and service penetrations. Those four account for the large majority of what we are called back to fix.

The client wants to value-engineer the waterproofing. What is safe to cut?

Finishes and non-structural build-up sometimes have room. What must not be cut is substrate preparation, membrane thickness, protection layers before backfill, and flood testing. Removing those saves a visible amount now and costs a great deal later.

NEXT STEP

Talk to us about your architect project

An engineer visits, identifies the actual source, and gives you a written scope you can act on. 40+ years of Mumbai buildings.

Mon–Fri 08:00–18:00 · Sat 09:00–16:00 · Jogeshwari West

Request a callback

Phone is the only required field. We call back to arrange the inspection.