Specialist Waterproofing Subcontractor for Main Contractors

As a specialist subcontractor we take the waterproofing package off a main contractor's critical path. That means mobilising to your programme, holding your inspection points, coordinating with the trades either side of us, and producing the records your client's PMC will demand.

A project manager, planning engineer or procurement lead at a main contracting firm packaging out waterproofing.

CONSTRAINTS

What actually makes this difficult

The technical work overlaps with every other kind of building. The constraints are what differ, and they are what a contractor either understands or does not.

Programme dependency
Waterproofing sits between structure and finishes. Slippage propagates in both directions.
Interface coordination
MEP penetrations and RCC tolerances decide whether the barrier can actually be completed.
Back-to-back liability
Your obligations to the client flow down to us and have to be met.
Measurement and billing
Work must be measurable and billable against the package.
METHOD

How we work on these projects

  • Mobilise to your programme and confirm hold points in writing.
  • Flag interface problems — uncollared MEP penetrations, out-of-tolerance falls — early, in writing.
  • Photographic records at every stage, formatted for your handover file.
  • Measurement and billing aligned to your package structure.
TYPICAL SCOPE

Systems this kind of project usually needs

QUESTIONS

Main Contractors — questions we get asked

Can you mobilise at short notice for a pre-pour window?

Where the window is confirmed with reasonable notice, yes. Pre-applied below-grade membrane has one opportunity, so we confirm the hold point formally rather than relying on a verbal date.

Who is liable if another trade damages the membrane?

We photograph the completed membrane at handover to the next trade, which establishes its condition. Damage after that point is recorded and repaired as a variation, not absorbed silently.

Do you provide method statements for our safety file?

Yes — method statement, risk assessment and material safety datasheets before mobilisation.

NEXT STEP

Talk to us about your main contractor project

An engineer visits, identifies the actual source, and gives you a written scope you can act on. 40+ years of Mumbai buildings.