Polyurea is among the most expensive systems per square foot, and the cost is dominated by preparation and equipment rather than by the material. It is bought for speed of return to service, seamlessness on complex geometry, and abrasion resistance — if none of those matter on your project, it is the wrong specification.
To be confirmed
We have chosen not to publish a figure we cannot stand behind for your specific building. What follows is more useful anyway: what actually moves the number, and how to compare two quotations honestly.
What actually moves the number
In rough order of how much they typically matter.
- Mechanical preparation
- Shot blasting or grinding to an open profile is a substantial cost line and is not optional.
- Primer system
- Polyurea adheres through its primer. Substrate moisture determines which primer and therefore the cost.
- Applied thickness
- 1.5 mm and 3.0 mm are meaningfully different quantities of a costly material.
- Specialist equipment and crew
- Heated plural-component spray plant and trained applicators carry a mobilisation cost that suits larger areas better than small ones.
- UV topcoat
- An aliphatic topcoat is needed wherever the surface stays exposed.
What a quotation should and should not include
Normally included
- Mechanical surface preparation
- Moisture testing
- Primer
- Spray-applied polyurea to specified DFT
- Detailing at joints and terminations
- DFT and adhesion testing
Normally excluded
- Substrate repair and crack stabilisation
- Aliphatic topcoat unless specified
- Protection layer where trafficked
Warning signs in a cheap quotation
None of these prove bad faith. All of them mean the two quotations in front of you are not for the same work.
- No mechanical preparation line item
- No substrate moisture measurement in the method
- Primer omitted or treated as optional
- No dry film thickness verification offered
- Aromatic polyurea proposed for permanent UV exposure without a topcoat
What polyurea waterproofing involves
Polyurea is a spray-applied, fast-setting elastomeric coating that gels within seconds and forms a seamless, high-elongation, highly abrasion-resistant membrane. Because it has no joints and builds thickness in a single pass, it suits complex geometry and structures that must return to service quickly — tanks, podiums, parking decks and pools.
Full specification, method and materials →Related cost guides
- Terrace Waterproofing Cost in Mumbai
- Basement Waterproofing Cost in Mumbai
- Bathroom Waterproofing Cost in Mumbai
- Brick Bat Coba Cost in Mumbai
- China Mosaic Waterproofing Cost in Mumbai
- APP Membrane Waterproofing Cost in Mumbai
- SBS Membrane Waterproofing Cost in Mumbai
- PU Grouting Cost in Mumbai
- Injection Grouting Cost in Mumbai
- Podium Waterproofing Cost in Mumbai
- Water Tank Waterproofing Cost in Mumbai
- Underground Tank Waterproofing Cost in Mumbai
Cost — questions we get asked
Why will you not publish a rate for this?
Because a rate quoted without seeing the building is either meaningless or misleading. The condition of the existing structure changes the number more than anything else, and it cannot be assessed over the phone. We publish what drives the cost instead, so you can interrogate any quotation — including ours.
What makes two quotations for the same job differ so much?
Almost always the invisible work. Shot blasting or grinding to an open profile is a substantial cost line and is not optional. Beyond that, the items most often trimmed are preparation, curing time and testing — none of which are visible at handover and all of which decide whether the system lasts.
What should I check before accepting a quotation?
That it states thickness, curing period, junction and penetration detailing, and what testing is carried out before anything is covered. A quotation that omits all four is not comparable to one that states them, whatever the headline rate says.
Is the site inspection chargeable?
No. The inspection and the itemised scope that follows are free and carry no obligation. You are free to take that scope to any contractor.
Get an itemised quotation you can actually compare
An engineer visits, establishes the real condition, and gives you a rate-wise scope. A housing society committee can put it line by line to a general body meeting.
Mon–Fri 08:00–18:00 · Sat 09:00–16:00 · Jogeshwari West