GLOSSARY / SYSTEMS

Brick Bat Coba

A traditional Indian terrace treatment of broken brick pieces bedded in waterproofed cement mortar, laid to a fall and finished with china mosaic or IPS. Typically 75 to 115 mm thick.

WHY IT MATTERS

On an actual building

It does three jobs at once — creates the fall, insulates the slab against heat, and forms a thick forgiving barrier. It remains the default on society terraces because it is repairable and locally serviceable.

COMMONLY MISUNDERSTOOD

What we most often have to correct

That it can be laid quickly. Coba needs 14 to 21 days of water curing, and compressing that is the most common reason it cracks.

QUESTIONS

Brick Bat Coba — questions we get asked

What does brick bat coba mean in waterproofing?

A traditional Indian terrace treatment of broken brick pieces bedded in waterproofed cement mortar, laid to a fall and finished with china mosaic or IPS. Typically 75 to 115 mm thick.

Why does brick bat coba matter on a real project?

It does three jobs at once — creates the fall, insulates the slab against heat, and forms a thick forgiving barrier. It remains the default on society terraces because it is repairable and locally serviceable.

What do people commonly get wrong about brick bat coba?

That it can be laid quickly. Coba needs 14 to 21 days of water curing, and compressing that is the most common reason it cracks.

NEXT STEP

Have a building showing this?

If a term on this page describes something you are looking at, a site inspection will tell you how far it has gone and what it needs. It costs nothing.

Mon–Fri 08:00–18:00 · Sat 09:00–16:00 · Jogeshwari West

Request a callback

Phone is the only required field. We call back to arrange the inspection.